000 | 00645nam a2200193Ia 4500 | ||
---|---|---|---|
999 |
_c7979 _d7979 |
||
005 | 20211004151105.0 | ||
008 | 170111s9999 xx 000 0 und d | ||
041 | _aeng | ||
082 | _a2009BPLN024 | ||
100 |
_aPeshwani, Kamal _947867 |
||
245 |
_aRout rationalization study of Bhopal city link limited buses / _cKamal Peshwani ; Under the guidance of Paulose N.Kuriakose |
||
260 |
_c2013. _aBhopal : _bSchool of Planning and Architecture , |
||
300 |
_axv 90 p. _ewith |
||
500 | _aBachelor of Planning | ||
502 | _awith CD | ||
700 |
_aKuriakose, Paulose N. _eguide _947868 |
||
942 | _cTH | ||
950 |
_aSPA Bhopal _b2009BPLN024 _d2013 |