Guide to DB05: JCT design and build contract (DB) /
by Sarah Lupton
- London: Riba Pub., 2009.
- xi,183 p.
1.Introduction to design and build procurement-- 2.About DB05-- 3.Documents-- 4.Obligation of the contractor-- 5.Possession and completion-- 6.Control of the works-- 7.Sums properly due-- 8.Payment-- 9.Indemnity and insurance-- 10.Default and termination-- 11.Despute resolution .