Local cover image
Local cover image

Construction management and machinery / by B.L. Gupta

By: Material type: TextTextLanguage: English Publication details: Standard Pub., 2010. Delhi:Edition: 4th edDescription: xiv, 544 pISBN:
  • 8180141217
Subject(s): DDC classification:
  • 338.47624 GUP-C
Contents:
1.The construction industry in india -- 2.Feasibility report-- 3.Construction planning-- 4.Construction management-- 5.Scheduling-- 6.Net work technique sin construction management-- 7.Program evaluation and review technique ( PERT )-- 8.Critical path method net work analysis -- 9.Precedence net works -- 10.Cost control -- 11.Resources allocation-- 12.Net work and control ( UPDATING )-- 13.Cost control in construction -- 14.Job Layout -- 15.Progress report -- 16.Motivation -- 17.Inspection and quality control-- 18.Safety measures in construction works-- 19.Construction equipment -- 20.Earth excavating machinery -- 21.Earth compaction equipment-- 22.Finishing and hauling equipment-- 23.Rock drilling equipment-- 24.Rock crushing and concrete producing equipment-- 25.Hoisting equipment-- 26.Pilws and pile driving equipment -- 27.Water pumping equipment-- 28.Asphalt concrete plants-- 29.Organisation of public works department-- 30.General outlines of P.W.D.system of accounts-- 31.Works and their execution-- 32.Methods of execution of work-- 33.Works Account-- 34.Payments-- 35.Stores -- 36.Organisation-- 37.Construction labour and relevant labour and industrial laws-- 38.Constuction Disputes and their settlement -- 39.Total quality management ( T.Q.M.)
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Books Books Library, SPAB F-1 Non Fiction 338.47624 GUP-C (Browse shelf(Opens below)) Available 002375
Total holds: 0

1.The construction industry in india --
2.Feasibility report--
3.Construction planning--
4.Construction management--
5.Scheduling--
6.Net work technique sin construction management--
7.Program evaluation and review technique ( PERT )--
8.Critical path method net work analysis --
9.Precedence net works --
10.Cost control --
11.Resources allocation--
12.Net work and control ( UPDATING )--
13.Cost control in construction --
14.Job Layout --
15.Progress report --
16.Motivation --
17.Inspection and quality control--
18.Safety measures in construction works--
19.Construction equipment --
20.Earth excavating machinery --
21.Earth compaction equipment--
22.Finishing and hauling equipment--
23.Rock drilling equipment--
24.Rock crushing and concrete producing equipment--
25.Hoisting equipment--
26.Pilws and pile driving equipment --
27.Water pumping equipment--
28.Asphalt concrete plants--
29.Organisation of public works department--
30.General outlines of P.W.D.system of accounts--
31.Works and their execution--
32.Methods of execution of work--
33.Works Account--
34.Payments--
35.Stores --
36.Organisation--
37.Construction labour and relevant labour and industrial laws--
38.Constuction Disputes and their settlement --
39.Total quality management ( T.Q.M.)


There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image

Library, SPA Bhopal, Neelbad Road, Bhauri, Bhopal By-pass, Bhopal - 462 030 (India)
Ph No.: +91 - 755 - 2526805 | E-mail: [email protected]

OPAC best viewed in Mozilla Browser in 1366X768 Resolution.
Free counter